Archive for March, 2015

EnergyU User Tip Sheet

March 20, 2015

Click HERE to download a handy tip sheet for users taking courses on EnergyU.

192 Course Maintenance Complete

March 20, 2015

The 192 course maintenace is complete and all courses were returned to online status this morning, approximately 5:00am CST.

Continuation of Course Updates

March 19, 2015

The first round of courses are back online. The following courses will be offline this evening (March 19) and will be returned online Friday morning.
• 192-0702 e-TNG Customer Regulating, Limiting, and Relief Devices
• 192-0702 KNT Customer Regulating, Limiting, Relief Device – Op/Maint
• 192-0802 e-TNG Protection During Disturbance of Segment Support
• 192-0802 KNT Protection During Disturbance of Segment Support
• 192-0901 e-TNG System Patrolling
• 192-0901 KNT System Patrolling
• 192-1001 e-TNG Cast Iron Joints Sealing
• 192-1001 KNT Cast Iron Joints – Sealing
• 192-1002 e-TNG Plastic Pipe: Electrofusion
• 192-1002 KNT Plastic Pipe – Electrofusion
• 192-1201 e-TNG Leakage Survey: Distribution and Transmission
• 192-1201 KNT Leakage Survey: Distribution and Transmission
• 192-1401 e-TNG Abandonment or Inactivation of Facilities
• 192-1401 KNT Abandonment or Inactivation of Facilities
• 192-1403 e-TNG Installation of Steel Pipe – Field Bends
• 192-1403 KNT Installation of Steel Pipe – Field Bends
• 192-1404 e-TNG Casing Vents and Seals
• 192-1404 KNT Casing Vents and Seals
• 192-1408 e-TNG Installation of Plastic Pipe
• 192-1408 KNT Installation of Plastic Pipe
• 192-1409 e-TNG Installation of Steel Pipe
• 192-1409 KNT Installation of Steel Pipe
• 192-1413 e-TNG Line Markers
• 192-1413 KNT Line Markers
• 192-1414 e-TNG Pipeline Shutdown, Startup, or Pressure Change
• 192-1414 KNT Pipeline Shutdown, Startup, or Pressure
• 192-1417 e-TNG Protection When Minimum Cover Not Met
• 192-1417 KNT Protection When Minimum Cover Not Met
• 192-1424 e-TNG Support, Expansion Joints, and Anchor Maintenance – Exposed Pipelin
• 192-1424 KNT Support, Expansion Joints and Anchor Maintenance – Exposed Pipeline
• 192-1425 e-TNG Tapping Cast and Ductile Iron Pipe
• 192-1425 KNT Tapping Cast Iron and Ductile Iron Pipe
• 192-1426 e-TNG Tapping Steel and Plastic Pipe
• 192-1426 KNT Tapping Steel and Plastic Pipe
• 192-1430 e-TNG Internal Sealing: Cast Iron and Ductile Iron Segments
• 192-1430 KNT Internal Sealing-Cast Iron and Ductile I
• 192-1431 e-TNG Segment Removal
• 192-1431 KNT Segment Removal
• 192-1432 e-TNG Leak Clamps and Sleeves
• 192-1432 KNT Bolt-on Leak Clamps and Sleeves
• 192-1434 e-TNG Bypass – Regulator Stations & Meter Sets
• 192-1434 KNT Bypass – Regulator Stations & Meter Sets
• 192-1435 e-TNG Bypass – Gas Mains and Services
• 192-1435 KNT Bypass – Gas Mains and Services
• 192-1802 e-TNG Vault Maintenance
• 192-1802 KNT Vault Maintenance
• 192-1803 e-TNG Pressure Regulating, Limiting, and Relief Device Operation and Maint
• 192-1803 KNT Pressure Regulating, Limiting, and Relie

Important Course Information

March 19, 2015

EnergyU Administrators,
Please understand and educate your users on course scoring as follows:

graphic

If a course is “Passed” or “Failed,” the EnergyU Administrator MUST reset the course in order for a new score to be registered with the LMS.
Make sure that users verify the course says “Not started” prior to launching.
Passing for TNG courses is based on percentage of learning content viewed – not on pre-test score. Users can always re-launch training courses to review the training content, however, REMEMBER that a new score will not be registered unless the course is reset by the EnergyU Administrator.

192 Course Maintenance

March 19, 2015

Over the next two days, select groups of courses from the 192 course library will be temporarily taken offline for maintenance. The following courses will go offline this morning (March 19, 2015) at approximately 7:30 am CST:

  • 192-0201 e-TNG Gas Detection and Alarm System Maintenance
  • 192-0201 KNT Gas Detection and Alarm System Maintenance
  • 192-0202 e-TNG Isolation of a Gas Compressor Unit
  • 192-0202 KNT Isolation of Compressor Units
  • 192-0205 e-TNG Compressor Station Inspection and Testing
  • 192-0205 KNT Compressor Station Inspection and Testing
  • 192-0301 e-TNG Operating a Gas Compressor Unit
  • 192-0301 KNT Operating Gas Compressor Units
  • 192-0302 e-TNG Shutting Down a Gas Compressor
  • 192-0302 KNT Shutting Down Gas Compressor Units
  • 192-0303 e-TNG Starting a Turbine Driven Gas Compressor Unit
  • 192-0303 KNT Starting Gas Compressor Units
  • 192-2010 e-TNG Service Line Replacement
  • 192-2010 KNT Service Line Replacement
  • 192-2014 e-TNG Service Lines Not In Use and Service Discontinuance
  • 192-2014 KNT Service Discontinuance
  • 192-2301 e-TNG Uprating Steel Pipelines
  • 192-2301 KNT Uprate Steel Pipeline to Pressure Producing Hoop Stress >= 30% SMYS
  • 192-2302 e-TNG Uprating Steel Pipelines Less Than 30% SMYS
  • 192-2302 KNT Uprating Pipeline to Pressure Producing Hoop Stress < 30% SMYS
  • 192-2401 e-TNG Welding
  • 192-2401 KNT Welding
  • 192-2402 e-TNG Visual Inspection of Welds
  • 192-2402 KNT Visual Inspection of Welds
  • 192-2403 e-TNG Nondestructive Testing of Welds
  • 192-2403 KNT Nondestructive Testing of Welds
  • 192-2405 e-TNG Miter Joints
  • 192-2405 KNT Miter Joints
  • 192-2705 e-TNG Gas Control
  • 192-2705 KNT Gas Control
  • 192-1419 e-TNG Uprating: Reinforce or Anchor Offsets, Bends, and Dead Ends
  • 192-1419 KNT Uprating: Reinforce or Anchor Offsets, Bends, and Dead Ends
  • 192-1421 e-TNG Installation of Steel Pipe: Repair of Imperfections and Damage
  • 192-1421 KNT Installation of Steel Pipe: Repair of Imperfections and Damage
  • 192-1422 e-TNG Segment Repair, Replacement, Etc.

User records, course lists and company curricula will not be affected by this maintenance. Contact EnergyU Technical Support with any questions (651-289-9600 x112).